A / B / C / D / E /  F / G / H / I / J /  K / L / M / N / O /  P / R / S / T / UV / W / Z

Annual Bibliography of Commonwealth Literature 2007
This paper argues that discourses of love in Ghanaian market literature for youth offer a view into complex negotiations of agency and empowerment. Drawing on Deborah Durham's notion of youth as "social `shifters'" and Francis Nyamnjoh's conception of the "interconnectedness" of agency, I take Ghanaian market literature as one specific case of how African literature for youth foregrounds questions of continuity and change as African societies enter into increasingly complex global relations. In this literature for youth, received notions of love, often constructed out of impressions from American pop and hip hop music, carry new notions of agency that compete with existing "domesticated" forms. Authors like Ike Tandoh and Evelyn Tay employ discourses of love to offer youth alternative avenues for empowerment in a context of socio-economic disenfranchizement. In a creative process of "straddling", this writing both reveals and reproduces the contradictions that obtain in youth configurations of agency.

Acetylene, The Principles Of Its Generation And Use

F >> F. H. Leeds and W. J. Atkinson Butterfield >> Acetylene, The Principles Of Its Generation And Use

Pages:
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40



2. The carbide must be completely decomposed in the apparatus so that no
acetylene can be evolved from the residue. The residues must be diluted
with water before being discharged into drains or cesspools, and sludge
storage-pits must be in the open.

3. The apparatus must preclude the escape of lime into the gas and water
connexions.

4. Glass parts must be adequately protected.

5. Rubber connexions between the generator, gasholder, and main are
absolutely prohibited with installations supplying more than 30 burners.

6. Cocks must be provided for cutting off the main and connexions from
the generator and gasholder.

7. Each burner must have an independent tap.

8. Generators of groups (_b_), (_c_), and (_d_) must be
constructed so that no after-generation of acetylene can take place
automatically and that any surplus gas would in any case be carried out
of the generator house by a vent-pipe.

The third section deals with generator houses, which must be well
ventilated and light; must not be used for any other purpose except to
store one day's consumption of carbide, not exceeding 300 kilos.; must be
fire-proof; must have doors opening outwards; and the vent-pipes must
terminate at a safe place in the open. Apparatus of group (_b_) must
not be placed in a dwelling-room and only in an adjoining room if the
gasholder is of less than 600 litres capacity. Apparatus of group
(_c_) must be in an independent building which must be at least 33
feet from occupied premises if the capacity of the gasholder is 6000
litres and upwards. Half this distance suffices for gasholders containing
600 to 6000 litres. These distances may be reduced at the discretion of
the local authorities provided a substantial partition wall at least 1
foot thick is erected. Apparatus of group (_d_) must be at least 50
feet from occupied premises and the gasholder and generator must not be
in the same building.

The fourth section deals with the question of authorisation for the
installation of acetylene plant. Apparatus of group (_a_) may be
installed without obtaining permission from any authorities. In regard to
apparatus of the other groups, permission for installation must be
obtained from local or other authorities.

The fifth section relates to the working of acetylene plant. It makes the
concessionaires and owners of the plant responsible for the manipulation
and supervision of the apparatus, and for the employment of suitable
operators, who must not be less than 18 years of age.

The sixth section relates to the inspection of acetylene plant from time
to time by inspectors appointed by the local or other authorities.
Apparatus of group (_a_) is not subject to these periodical
inspections.

The seventh section details the fees payable for the inspection of
installations and carbide stores, and fixes the penalties for non-
compliance with the regulations.

The eighth section refers to the notification of the position and
description of all carbide works, stores, and acetylene installations to
the local authorities.

The HUNGARIAN GOVERNMENT rules for the construction and examination of
acetylene plant forbid the use of copper and of its alloys; cocks,
however, may be made of a copper alloy. The temperature in the gas space
of a fixed generator must not exceed 50 deg. C., in that of a portable
apparatus 80 deg. C. The maximum effective pressure permissible is 0.15
atmosphere.

The CONSEIL D'HYGIENE DE LA SEINE IN FRANCE allows a maximum pressure of
1.5 metres, i.e., 59 inches, of water column in generators used for the
ordinary purposes of illumination; but apparatus intended to supply gas
to the low-pressure oxy-acetylene blowpipe (see Chapter IX.) may develop
up to 2.5 metres, or 98.5 inches of water pressure, provided copper and
its alloys are entirely excluded from the plant and from the delivery-
pipes.

The NATIONAL BOARD OF FIRE UNDERWRITERS OF THE UNITED STATES OF AMERICA
has issued a set of rules and requirements, of which those relating to
acetylene generators and plant are reproduced below. The underwriters
state that, "To secure the largest measure of safety to life and
property, these rules for the installation of acetylene gas machines must
be observed."

RULES FOR THE INSTALLATION AND USE OF ACETYLENE GAS GENERATORS.
[Footnote: The "gallon" of these rules is, of course, the American
gallon, which is equal to 0.83 English standard gallon.]

The use of liquid acetylene or gas generated therefrom is absolutely
prohibited.

Failure to observe these rules is as liable to endanger life as property.

To secure the largest measure of safety to life and property, the
following rules for the installation of acetylene gas machines must be
observed.

_Class A.--Stationary Automatic Apparatus._

1. FOUNDATIONS.--(_a_) Must, where practicable, be of brick, stone,
concrete or iron. If necessarily of wood they shall be extra heavy,
located in a dry place and open to the circulation of air.

The ordinary board platform is not satisfactory. Wooden foundations shall
be of heavy planking, joists or timbers, arranged so that the air will
circulate around them so as to form a firm base.

(_b_) Must be so arranged that the machine will be level and unequal
strain will not be placed on the generator or connexions.

2. LOCATION.--(_a_) Generators, especially in closely built up
districts should preferably be placed outside of insured buildings in
generator houses constructed and located in compliance with Rule 9.

(_b_) Generators must be so placed that the operating mechanism will
have room for free and full play and can be adjusted without artificial
light. They must not be subject to interference by children or careless
persons, and if for this purpose further enclosure is necessary, it must
be furnished by means of slatted partitions permitting the free
circulation of air.

(_c_) Generators which from their construction are rendered
inoperative during the process of recharging must be so located that they
can be recharged without the aid of artificial light.

(_d_) Generators must be placed where water will not freeze.

3. ESCAPES OR RELIEF-PIPES.--Each generator must be provided with an
escape or relief-pipe of ample size; no such pipe to be less than 3/4-
inch internal diameter. This pipe shall be substantially installed,
without traps, and so that any condensation will drain back to the
generator. It must be carried to a suitable point outside the building,
and terminate in an approved hood located at least 12 feet above ground
and remote from windows.

The hood must be constructed in such a manner that it cannot be
obstructed by rain, snow, ice, insects or birds.

4. CAPACITY.--(_a_) Must be sufficient to furnish gas continuously
for the maximum lighting period to all lights installed. A lighting
period of at least 5 hours shall be provided for in every case.

(_b_) Generators for conditions of service requiring lighting period
of more than 5 hours must be of sufficient capacity to avoid recharging
at night. The following ratings will usually be found advisable.

(i) For dwellings, and where machines are always used intermittently, the
generator must have a rated capacity equal to the total number of burners
installed.

(ii) For stores, opera houses, theatres, day-run factories, and similar
service, the generator must have a rated capacity of from 30 to 50 per
cent, in excess of the total number of burners installed.

(iii) For saloons and all night or continued service, the generator must
have a rated capacity of from 100 to 200 per cent. in excess of the total
number of burners installed.

(_c_) A small generator must never be installed to supply a large
number of lights, even though it seems probable that only a few lights
will be used at a time. _An overworked generator adds to the cost of
producing acetylene gas_.

5. CARBIDE CHARGES.--Must be sufficient to furnish gas continuously for
the maximum lighting period to all burners installed. In determining
charges lump carbide must be estimated as capable of producing 4-1/2
cubic foot of gas to the pound, commercial 1/4-inch carbide 4 cubic feet
of gas to the pound, and burners must be considered as requiring at least
25 per cent. more than their rated consumption of gas.

6. BURNERS.--Burners consuming one-half of a cubic foot of gas per hour
are considered standard in rating generators. Those having a greater or
less capacity will decrease or increase the number of burners allowable
in proportion.

Burners usually consume from 25 to 100 per cent. more than their rated
consumption of gas, depending largely on the working pressure. The so-
called 1/2-foot burner when operated at pressures of from 20- to 25-
tenths inches water column (2 to 2-1/2 inches) is usually used with best
economy.

7. PIPING.--(_a_) Connexions from generators to service-pipes must
be made with right and left thread nipples or long thread nipples with
lock nuts. All forms of unions are prohibited.

(_b_) Piping must, as far as possible, be arranged so that any
moisture will drain back to the generator. If low points occur of
necessity in any piping, they must be drained through tees into drip cups
permanently closed with screw caps or plugs. No pet-cocks shall be used.

(_c_) A valve and by-pass connexion must be provided from the
service-pipe to the blow-off for removing the gas from the holder in case
it should be necessary to do so.

(_d_) The schedule of pipe sizes for piping from generators to
burners should conform to that commonly used for ordinary gas, but in no
case must the feeders be smaller than three-eighths inch.

The following schedule is advocated:

3/8 inch pipe, 26 feet, three burners.
1/2 inch pipe, 30 feet, six burners.
3/4 inch pipe, 50 feet, twenty burners.
1 inch pipe, 70 feet, thirty-five burners.
1-1/4 inch pipe, 100 feet, sixty burners.
1-1/2 inch pipe, 150 feet, one hundred burners.
2 inch pipe, 200 feet, two hundred burners.
2-1/2 inch pipe, 300 feet, three hundred burners.
3 inch pipe, 450 feet, four hundred and fifty burners,
3-1/2 inch pipe, 500 feet, six hundred burners.
4 inch pipe, 600 feet, seven hundred and fifty burners.

(_e_) Machines of the carbide-feed type must not be fitted with
continuous drain connexions leading to sewers, but must discharge into
suitable open receptacles which may have such connections.

(_f_) Piping must be thoroughly tested both before and after the
burners have been installed. It must not show loss in excess of 2 inches
within twelve hours when subjected to a pressure equal to that of 15
inches of mercury.

(_g_) Piping and connexions must be installed by persons experienced
in the installation of acetylene apparatus.

8. CARE AND ATTENDANCE.--In the care of generators designed for a
lighting period of more than five hours always clean and recharge the
generating chambers at regular stated intervals, regardless of the number
of burners actually used.

Where generators are not used throughout the entire year always remove
all water and gas and clean thoroughly at the end of the season during
which they are in service.

It is usually necessary to take the bell portion out and invert it so as
to allow all gas to escape. This should never be done in the presence of
artificial light or fire of any kind.

Always observe a regular time, during daylight hours only, for attending
to and charging the apparatus.

In charging the generating chambers of water-feed machines clean all
residuum carefully from the containers and remove it at once from the
building. Separate from the mass any unslacked carbide remaining and
return it to the containers, adding now carbide as required. Be careful
never to fill the containers over the specified mark, as it is important
to allow for the swelling of the carbide when it comes in contact with
water. The proper action and economy of the machine are dependent on the
arrangement and amount of carbide placed in the generator. Carefully
guard against the escape of gas.

Whenever recharging with carbide always replenish the water-supply.

Never deposit residuum or exhausted material from water-feed machines in
sewer-pipes or near inflammable material.

Always keep water-tanks and water-seals filled with clean water.

Never test the generator or piping for leaks with a flame, and never
apply flame to an outlet from which the burner has been removed.

Never use a lighted match, lamp, candle, lantern or any open light near
the machine.

Failure to observe the above cautions is as liable to endanger life as
property.

9. OUTSIDE GENERATOR HOUSES.--(_a_) Outside generator houses should
not be located within 5 feet of any opening into, nor shall they open
toward any adjacent building, and must be kept under lock and key.

(_b_) The dimensions must be no greater than the apparatus requires
to allow convenient room for recharging and inspection of parts. The
floor must be at least 12 inches above grade and the entire structure
thoroughly weather-proof.

(_c_) Generator houses must be thoroughly ventilated, and any
artificial heating necessary to prevent freezing shall be done by steam
or hot-water systems.

(_d_) Generator houses must not be used for the storage of calcium
carbide except in accordance with the rules relating to that subject
(_vide_ Chapter II.).

_Class B.--Stationary Non-Automatic Apparatus_.

10. FOUNDATIONS.--(_a_) Must be of brick, stone or concrete.

(_b_) Must be so arranged that the machine will be level and so that
strain will not be brought upon the connexions.

11. GAS-HOUSES.--(_a_) Must be constructed entirely of non-
combustible material and must not be lighted by any system of
illumination involving open flames.

(_b_) Must be heated, where artificial heating is necessary to
prevent freezing, by steam or hot-water systems, the heater to be located
in a separate building, and no open flames to be permitted within
generator enclosures.

(_c_) Must be kept closed and locked excepting during daylight
hours.

(_d_) Must be provided with a permanent and effective system of
ventilation which will be operative at all times, regardless of the
periods of operation of the plant.

12. ESCAPE-PIPES.--Each generator must be provided with a vent-pipe of
ample size, substantially installed, without traps. It must be carried to
a suitable point outside the building and terminate in an approved hood
located at least 12 feet above ground and remote from windows.

The hood must be constructed in such a manner that it cannot be
obstructed by rain, snow, ice, insects or birds.

13. CARE AND MAINTENANCE.--All charging and cleaning of apparatus,
generation of gas and execution of repairs must be done during daylight
hours only, and generators must not be manipulated or in any way tampered
with in the presence of artificial light.

This will require gasholders of a capacity sufficient to supply all
lights installed for the maximum lighting period, without the necessity
of generation of gas at night or by artificial light.

In the operation of generators of the carbide-feed type it is important
that only a limited amount of carbide be fed into a given body of water.
An allowance of at least one gallon of generating water per pound of
carbide must be made in every case, and when this limit has been reached
the generator should be drained and flushed, and clean water introduced.
These precautions are necessary to avoid over-heating during generation
and accumulation of hard deposits of residuum in the generating chamber.

(Rule 14, referring to the storage of carbide, has been quoted in Chapter
II. (page 19)).

RULES FOR THE CONSTRUCTION OF GENERATORS.

The following Rules are intended to provide only against the more
hazardous defects usually noted in apparatus of this kind. The Rules do
not cover all details of construction nor the proper proportioning of
parts, and devices which comply with these requirements alone are not
necessarily suitable for listing as permissible for use. These points are
often only developed in the examination required before permission is
given for installation.

_Class A.--Stationary Apparatus for Isolated Installations._

15. GENERAL RULES. GENERATORS.--(_a_) Must be made of iron or steel,
and in a manner and of material to insure stability and durability.

(_b_) Must be automatically regulated and uniform in their action,
producing gas only as immediate consumption demands, and so designed that
gas is generated without producing sufficient heat to cause yellow
discoloration of residuum (which will occur at about 500 deg. F.) or
abnormal pressure at any stage of the process when using carbide of any
degree of fineness.

The presence of excessive heat tends to change the chemical character of
the gas and may even cause its ignition, while in machines of the
carbide-feed type, finely divided carbide will produce excessive pressure
unless provision is made to guard against it.

(_c_) Must be so arranged that during recharging, back flow of gas
from the gasholder will be automatically prevented, or so arranged that
it will be impossible to charge the apparatus without first closing the
supply-pipe to the gasholder, and to the other generating chambers if
several are used.

This is intended to prevent the dangerous escape of gas.

(_d_) The water or carbide supply to the generating chamber must be
so arranged that gas will be generated long enough in advance of the
exhaustion of the supply already in the gasholder to allow the using of
all lights without exhausting such supply.

This provides for the continuous working of the apparatus under all
conditions of water-feed and carbide charge, and it obviates the
extinction of lights through intermittent action of the machine.

(_e_) No valves or pet-cocks opening into the room from the gas-
holding part or parts, the draining of which will allow an escape of gas,
are permitted, and condensation from all parts of the apparatus must be
automatically removed without the use of valves or mechanical working
parts.

Such valves and pet-cocks are not essential; their presence increases the
possibility of leakage. The automatic removal of condensation from the
apparatus is essential to the safe working of the machine.

U-traps opening into the room from the gas-holding parts must not be used
for removal of condensation. All sealed drip connexions must be so
arranged as to discharge gas to the blow-off when blown out, and the
seals must be self-restoring upon relief of abnormal pressure.

(_f_) The apparatus must be capable of withstanding fire from
outside causes.

Sheet-metal joints must be double-seamed or riveted and thoroughly
sweated with solder. Pipes must be attached to sheet-metal with lock-nuts
or riveted flanges.

This prohibits the use of wood or of joints relying entirely upon solder.

(_g_) Gauge glasses, the breakage of which would allow the escape of
gas, must not be used.

(_h_) The use of mercury seals is prohibited.

Mercury has been found unreliable as a seal in acetylene apparatus.(_i_)
Combustible oils must not be used in connexion with the
apparatus.

(_j_) The construction must be such that liquid seals shall not
become thickened by the deposit of lime or other foreign matter.

(_k_) The apparatus must be constructed so that accidental siphoning
of water will be impossible.

(_l_) Flexible tubing, swing joints, unions, springs, mechanical
check-valves, chains, pulleys, stuffing-boxes and lead or fusible piping
must not be used on acetylene apparatus except where failure of such
parts will not vitally affect the working or safety of the machine.

Floats must not be used excepting in cases where failure will result only
in rendering the machine inoperative.

(_m_) Every machine must be plainly marked with the maximum number
of lights it is designed to supply, the amount of carbide necessary for a
single charge, the manufacturer's name and the name of the machine.

16. GENERATING CHAMBERS.--(_a_) Must be constructed of galvanised
iron or steel not less than No. 24 U.S. Standard gauge in thickness for
capacities up to and including 20 gallons, not less than No. 22 U.S.
Standard gauge for capacities between 20 and 75 gallons, and not less
than No. 20 U.S. Standard gauge for capacities in excess of 75 gallons.

(_b_) Must each be connected with the gasholder in such a manner
that they will, at all times, give open connexion either to the gasholder
or to the blow-off pipe to the outer air.

This prevents dangerous pressure within or the escape of gas from the
generating chamber.

(_c_) Must be so constructed that not more than 5 pounds of carbide
can be acted upon at once, in machines which apply water in small
quantities to the carbide.

This tends to reduce the danger of overheating and excessive after-
generation by providing for division of the carbide charges in machines
of this type.

(_d_) Must be provided with covers having secure fastenings to hold
them properly in place and those relying on a water-seal must be
submerged in at least 12 inches of water. Water-seal chambers for covers
depending on a water-seal must be 1-1/2 inches wide and 15 inches deep,
excepting those depending upon the filling of the seal chambers for the
generation of gas, where 9 inches will be sufficient.

(_e_) Must be so designed that the residuum will not clog or affect
the working of the machine and can conveniently be handled and removed.

(_f_) Must be provided with suitable vent connexions to the blow-off
pipe so that residuum may be removed and the generating water replaced
without causing siphoning or introducing air to the gasholder upon
recharging.

This applies to machines of the carbide-feed type.

(_g_) Feed mechanism for machines of the carbide-feed type must be
so designed that the direct fall of carbide from the carbide holder into
the water of the generator is prevented at all positions of the feed
mechanisms; or, when actuated by the rise and fall of a gas-bell, must be
so arranged that the feed-valve will not remain open after the landing of
the bell, and so that the feed valve remains inoperative as long as the
filling opening on the carbide hopper remains open. Feed mechanisms must
always be far enough above the water-level to prevent clogging from the
accumulation of damp lime. For this purpose the distance should be not
less than 10 inches.

17. CARBIDE CHAMBERS.--(_a_) Must be constructed of galvanised iron
or steel not less than No. 24 U.S. Standard gauge in thickness for
capacities up to and including 50 pounds and not less than No. 22 U.S.
Standard gauge for capacities in excess of 50 pounds.

(_b_) Must have sufficient carbide capacity to supply the full
number of burners continuously and automatically during the maximum
lighting period.

This rule removes the necessity of recharging or attending to the machine
at improper hours. Burners almost invariably require more than their
rated consumption of gas, and carbide is not of staple purity, and there
should therefore be an assurance of sufficient quantity to last as long
as light is needed. Another important consideration is that in some
establishments burners are called upon for a much longer period of
lighting than in others, requiring a generator of greater gas-producing
capacity. Machines having several generating chambers must automatically
begin generation in each upon exhaustion of the preceding chamber.

(_c_) Must be arranged so that the carbide holders or charges may be
easily and entirely removed in case of necessity.

18. GASHOLDERS.--(_a_) Must be constructed of galvanised iron or
steel not less than No. 24 U.S. Standard gauge in thickness for
capacities up to and including 20 gallons, not less than No. 22 U.S.
Standard gauge for capacities between 20 and 75 gallons, and not less
than No. 20 U.S. Standard gauge for capacities in excess of 75 gallons.

Gas-bells, if used, may be two gauges lighter than holders.

Condensation chambers, if placed under holders, to be of same gauge as
holders.

(_b_) Must be of sufficient capacity to contain all gas generated
after all lights have been extinguished.

If the holder is too small and blows off frequently after the lights are
extinguished there is a waste of gas. This may suggest improper working
of the apparatus and encourage tampering.

(_c_) Must, when constructed on the gasometer principle, be so
arranged that when the gas-bell is filled to its maximum with gas at
normal pressure its lip or lower edge will extend at least 9 inches below
the inner water-level.

(_d_) Must, when constructed on the gasometer principle, have the
dimensions of the tank portion so related to those of the bell that a
pressure of at least 11 inches will be necessary before gas can be forced
from the holder.

(_e_) The bell portion of a gasholder constructed on the gasometer
principle must be provided with a substantial guide to its upward
movement, preferably in the centre of the holder, carrying a stop acting
to chock the bell 1 inch above the normal blow-off point.

Pages: